GOTAMI CONSTRUCTION MOVES INDOORS
The timing couldn’t be more perfect. As the temperatures falls below zero, Thomas’ crew finishes the outside just in time. The roofers astound us by getting the roofing on in not quite 3 days, and John finishes some of the last bit of drainage work before the deep freeze. The drywall crew is almost done hanging the sheetrock. The mudding, taping and texturing will begin this week. The work will continue through the winter months as the Abbey community takes turns offering service to keep things running smoothly. Gotami House is looking like a home more every day!

The fiber/cement siding is complete and looks fabulous with the dark brown trim.
A close up of the roofing with the solar tube in the background. The tube will cast light inside the hallway as you come through the front door. |
The Abbey residents place fiberglass insulation in between all the interior walls as a sound proofing measure.
|
|
|